Glossary

0%

Appetite

The amount of time we want to spend on a project, as opposed to an estimate.

Baseline

What customers are doing without the thing we’re currently building.

Bet

The decision to commit a team to a project for one cycle with no interruptions and an expectation to finish.

Betting table

A meeting during cool-down when stakeholders decide which pitches to bet on in the next cycle.

Big batch

One project that occupies a team for a whole cycle and ships at the end.

Breadboard

A UI concept that defines affordances and their connections without visual styling.

Circuit breaker

A risk management technique: Cancel projects that don’t ship in one cycle by default instead of extending them by default.

Cleanup mode

The last phase of building a new product, where we don’t shape or bet on any particular projects but instead allocate unstructured time to fix whatever is needed before launch.

Cool-down

A two-week break between cycles to do ad-hoc tasks, fix bugs, and hold a betting

table.

Cycle

A six week period of time where teams work uninterruptedly on shaped projects.

De-risk

Improve the odds of shipping within one cycle by shaping and removing rabbit holes.

Discovered tasks

Tasks the team discovers they need to do after they start getting involved in the real work.

Downhill

The phase of a task, scope or project where all unknowns are solved and only execution is left.

Fat marker sketch

A sketch of a UI concept at very low fidelity drawn with a thick line.

Hill chart

A diagram showing the status of work on a spectrum from unknown to known to done.

Iceberg

A scope of work where the back-end work is much more complex than the UI or vice versa.

Imagined tasks

Work the teams decide they need to do after just thinking about the project.

See discovered tasks.

Layer cake

A scope of work you can estimate by looking at the surface area of the UI.

Level of abstraction

The amount of detail we leave in or out when describing a problem or solution.

Must-haves

Tasks that must be completed for a scope to be considered done.

Nice-to-haves

Task left for the end of the cycle. If there isn’t time to do them, they get cut.

Marked with a '~' at the beginning.

Pitch

A document that presents a shaped project idea for consideration at the betting table.

Production mode

A phase of building a new product where the core architecture is settled and we apply the standard Shape Up process.

Rabbit hole

Part of a project that is too unknown, complex, or open-ended to bet on.

R&D mode

A phase of building a new product where a senior team spikes the core features to define the core architecture.

Raw ideas

Requests or feature ideas that are expressed in words and haven’t been shaped.

Scopes

Parts of a project that can be built, integrated, and finished independently of the rest of the project.

Scope hammering

Forcefully questioning a design, implementation, or use case to cut scope and finish inside the fixed time box.

Shape

Make an abstract project idea more concrete by defining key elements of the solution before betting on it.

Six weeks

The length of our cycles.

Six weeks is long enough to finish something meaningful and short enough to feel the deadline from the beginning.

Small batch

A set of 1-2 week projects that a single team ships by the end of a six week cycle.

Time horizon

The longest period of time where we can feel a deadline pushing on us from the beginning. Six weeks.

Uphill

The phase of a task, scope or project where there are still unkowns or unsolved problems. See downhill.